Rosatom — 80 years of the nuclear industry
An anniversary ceremony played to a full stadium. A semicircular LED arch spans the whole width of the stage, with a central circular portal, a truss staircase running to the top, and an array of large illuminated ring structures standing on the deck.
Termit's part: Full technical production of the show: engineering design, set decoration and stage mechanisation. Evgeniy Juhnevich, Termit
Question for Evgeniy: Which elements were mechanised — do the rings move during the show? They stand in a different configuration in every photograph. A clip of them moving would belong in the hero.
How it is built
Each large ring is a foam decor shell, 10,94 m across and 0,5 m deep, hung on a hexagonal truss carcass that also carries the lighting fixtures along its inner arc. The staircase runs on its own truss spine and passes through a ring.

Loads
The ring trusses were checked under their own weight with the decor, and under wind: 353 Pa on a 66 m² frontal area, a resultant of 23,4 kN per ring. Several schemes were compared before the build — TQ39 trusses throughout, heavier TQ52 outer trusses, and guy ropes. The staircase trusses were checked for their own weight, the decking and a 4 800 N load at the free end: minimum safety factor 2,1.
Technical data
| Ring outer diameter | 10,94 | m |
|---|---|---|
| Ring inner diameter | 4,9 | m |
| Ring decor depth | 0,5 | m |
| Foam decor per ring | 405 | kg |
| Design wind pressure | 353 | Pa |
| Wind resultant per ring | 23,4 | kN |
| Ring trusses | TQ39×39 · TQ52×52 | |
| Staircase point load at the free end | 4 800 | N |
| Staircase trusses, minimum safety factor | 2,1 |
Figures from Termit's strength calculations for the ring and staircase trusses.
Documentation: Design model, ring frame drawing, and strength calculations for the ring and staircase trusses — held by Termit.
Design
From the model to the stadium
Termit's 3D design model of the stage, November 2024 — nine months before the show. Rings, a staircase that passes through a ring, the arch and the portal were all worked out here first.
Contact
Tell us what has to move
Send the brief, the venue and the date. We will tell you whether it is possible and what it takes.
“Ready-made team, clear working structure, engineering design.”













