LED sphere — FIFA World Cup 2018 Draw
A six-metre illuminated sphere built as a football. Twenty LED screens sit on the hexagonal faces; the pentagons are infill panels finished as artificial turf. The same object was first installed for the Moscow Urban Forum, then used for the draw of the 2018 FIFA World Cup at the State Kremlin Palace.
Termit's part: Design and manufacture of the LED sphere. Termit company deck
How it is built
Five vertical posts stand on the base. They are joined at the top by two five-ray frames with corner elements between them. Five vertical meridian half-frames attach above and below through corner blocks. Posts and meridian frames are Prolyte H40V aluminium truss, joined by corner modules that also carry the screen frames. Outrigger feet bolt to the base through cover plates to increase stability.
Loads
The truss manufacturer allows a distributed load of 420 kgf/m over a 6 m assembly, giving 2 520 kgf. Each meridian frame carries two screen frames weighing 326 kgf together with screens and masking — a total of 652 kgf, four times below the permitted figure. Assembled weight is 5 200 kgf, evenly distributed; the structure is symmetrical, so its centre of gravity sits on the vertical axis.
Technical data
| Overall height | 6,03 | m |
|---|---|---|
| Plan dimension | 6,29 | m |
| Height × width × depth, as built | 5,9 × 6,0 × 6,0 | m |
| Base radius | 2,08 | m |
| Assembled weight with LED modules | 5 200 | kgf |
| LED screens | 20 | pcs |
| Materials | Steel 3 · aluminium | |
| Truss system | Prolyte H40V |
Figures taken from Termit's own product passport for the structure, approved by the General Director.
Parts list
| Prolyte H40V truss, 2 m | 10 | pcs |
|---|---|---|
| Prolyte H40V truss, 1.5 m | 30 | pcs |
| Prolyte H40V box corner | 10 | pcs |
| Base plate with outrigger feet | 1 | pcs |
| Top connecting element | 1 | pcs |
| Steel connecting corner | 30 | pcs |
| Steel frame for LED screens | 20 | pcs |
| Decorative masking frame | 20 | pcs |
Documentation: Product passport, parts list and load calculation exist and are held by Termit.