A six-metre illuminated sphere built as a football. Twenty LED screens sit on the hexagonal faces; the pentagons are infill panels finished as artificial turf. The same object was first installed for the Moscow Urban Forum, then used for the draw of the 2018 FIFA World Cup at the State Kremlin Palace.

Termit's part: Design and manufacture of the LED sphere. Termit company deck

How it is built

Five vertical posts stand on the base. They are joined at the top by two five-ray frames with corner elements between them. Five vertical meridian half-frames attach above and below through corner blocks. Posts and meridian frames are Prolyte H40V aluminium truss, joined by corner modules that also carry the screen frames. Outrigger feet bolt to the base through cover plates to increase stability.

Loads

The truss manufacturer allows a distributed load of 420 kgf/m over a 6 m assembly, giving 2 520 kgf. Each meridian frame carries two screen frames weighing 326 kgf together with screens and masking — a total of 652 kgf, four times below the permitted figure. Assembled weight is 5 200 kgf, evenly distributed; the structure is symmetrical, so its centre of gravity sits on the vertical axis.

Technical data

Overall height6,03m
Plan dimension6,29m
Height × width × depth, as built5,9 × 6,0 × 6,0m
Base radius2,08m
Assembled weight with LED modules5 200kgf
LED screens20pcs
MaterialsSteel 3 · aluminium
Truss systemProlyte H40V

Figures taken from Termit's own product passport for the structure, approved by the General Director.

Parts list

Prolyte H40V truss, 2 m10pcs
Prolyte H40V truss, 1.5 m30pcs
Prolyte H40V box corner10pcs
Base plate with outrigger feet1pcs
Top connecting element1pcs
Steel connecting corner30pcs
Steel frame for LED screens20pcs
Decorative masking frame20pcs

Documentation: Product passport, parts list and load calculation exist and are held by Termit.

Contact

Tell us what has to move

Send the brief, the venue and the date. We will tell you whether it is possible and what it takes.

“Ready-made team, clear working structure, engineering design.”

DRAFT · amber items need Evgeniy