← All projects

Rosatom — 80 years of the nuclear industry

Stadium ceremony · Nizhny Novgorod · 2025

An anniversary ceremony played to a full stadium. A semicircular LED arch spans the whole width of the stage, with a central circular portal, a truss staircase running to the top, and an array of large illuminated ring structures standing on the deck.

Termit's part: Full technical production of the show: engineering design, set decoration and stage mechanisation. Evgeniy Juhnevich, Termit

Question for Evgeniy: Which elements were mechanised — do the rings move during the show? They stand in a different configuration in every photograph. A clip of them moving would belong in the hero.

How it is built

Each large ring is a foam decor shell, 10,94 m across and 0,5 m deep, hung on a hexagonal truss carcass that also carries the lighting fixtures along its inner arc. The staircase runs on its own truss spine and passes through a ring.

Ring frame: the hexagonal truss carcass inside the decorative ring, with the lighting positions on the inner arc
Ring frame: the hexagonal truss carcass inside the decorative ring, with the lighting positions on the inner arc

Loads

The ring trusses were checked under their own weight with the decor, and under wind: 353 Pa on a 66 m² frontal area, a resultant of 23,4 kN per ring. Several schemes were compared before the build — TQ39 trusses throughout, heavier TQ52 outer trusses, and guy ropes. The staircase trusses were checked for their own weight, the decking and a 4 800 N load at the free end: minimum safety factor 2,1.

Technical data

Ring outer diameter10,94m
Ring inner diameter4,9m
Ring decor depth0,5m
Foam decor per ring405kg
Design wind pressure353Pa
Wind resultant per ring23,4kN
Ring trussesTQ39×39 · TQ52×52
Staircase point load at the free end4 800N
Staircase trusses, minimum safety factor2,1

Figures from Termit's strength calculations for the ring and staircase trusses.

Documentation: Design model, ring frame drawing, and strength calculations for the ring and staircase trusses — held by Termit.

Design

From the model to the stadium

Termit's 3D design model of the stage, November 2024 — nine months before the show. Rings, a staircase that passes through a ring, the arch and the portal were all worked out here first.

Contact

Tell us what has to move

Send the brief, the venue and the date. We will tell you whether it is possible and what it takes.

“Ready-made team, clear working structure, engineering design.”

DRAFT · amber items need Evgeniy