Truss staircase under construction with a person on the top platform
← Home

The part clients never see

The model, and a project stage by stage

Termit has no production of its own. That is deliberate, and it is stated in the company's own words:

Because we have no production of our own and no staff, our hands are free to find the most effective solution for you. Our team plays for you, not for itself — so we look for the technical solution you need, not the one sitting in our warehouse.

What Termit supplies instead is the engineering link between a project and any production able to build it, together with control, delivery and logistics.

Why that is worth something to you

  1. you do not spend your own time on technical development
  2. you do not keep a design office or a team of engineers
  3. you do not pay for our office — we are hired for the project, not permanently
  4. you can bring your own solution, or your own production, and we will supply the drawings and supervise the work
  5. speed, because we are not held to the capacity of a single plant
  6. you know in advance what you will get, because the project is drawn down to the last detail

Stage by stage

How a project runs

01

Brief and constraints

The date, the venue, the load limits, what has to move and how far. Most of what follows is decided here.

02

Concept and scenography

The idea taken to the point where it can be approved and costed. For Universiade Almaty 2017 that went as far as presenting the project to the leadership of Kazakhstan.

03

Working drawings

General views, assembly drawings, rigging plots, screen and lighting layouts — the deliverable a fabricator and a venue can both build from.

Star of Asia, Medeu — general view, sheet 1 of 2, issued 27 July 2017
Star of Asia, Medeu — general view, sheet 1 of 2, issued 27 July 2017
04

Load calculation

Allowable against actual, with the margin written down. For the LED sphere: 420 kgf/m allowed by the truss manufacturer against 652 kgf actually carried per meridian frame — four times below the limit — and a centre of gravity on the vertical axis.

Load-bearing frame of the LED sphere — front view, plan and isometric, from Termit's product passport
Load-bearing frame of the LED sphere — front view, plan and isometric, from Termit's product passport
05

Production

Placed with the production that fits the job, and supervised there. Capacity is not limited to one plant's schedule.

06

Rigging and installation

A rigging plot for the venue, then a crew on the floor inside the window you are given.

Chess Olympiad opening ceremony, BSA Arena Batumi — rigging plot, 23 September 2018
Chess Olympiad opening ceremony, BSA Arena Batumi — rigging plot, 23 September 2018
07

Commissioning and handover

Testing, running the show, and the documentation that goes with the object: passport, parts list, load calculation.

Drawings on this page are Termit's own work and carry the company's copyright block.

Contact

Tell us what has to move

Send the brief, the venue and the date. We will tell you whether it is possible and what it takes.

“Ready-made team, clear working structure, engineering design.”

DRAFT · amber items need Evgeniy